Moulded Air Valve Tees

Black Moulded Air Valve Tees / PN10 / SDR17

The Mill-Pro PE100 Injection moulded spigot air valve Tees are typically used for attaching air valves via a flanged connection, cut into the pipeline or installed during construction. They are manufactured using Mill-Pro's own tooling under our continuous inspection. They feature long spigots for electrofusion or butt fusion joining and built-in reinforcement that exceeds the type testing requirements of BS EN 12201-3.  Mill-Pro fittings feature hard moulded brand, batch numbers for compliance checking and 1D and 2D bar code stickers for complete product traceability. All Tee's are sealed in individual plastic bags for protection on site.

The transition from the Tee to the flange connecting the isolation/air valve assembly is made using a standard Coupler and Flange adaptor onto the Tee's spigot outlet.

NOTE: The pipe and spigot ends must be prepared in accordance with the general installation instructions using a spigot mechanical peeler, 90% Isopropyl alcohol wipes.

P5314.22.110063 110 63 82 63 250 134 4-6 Weeks
P5314.22.110090 110 90 82 79 280 150 4-6 Weeks
P5314.22.125063 125 63 87 70 260 145 4-6 Weeks
P5314.22.125090 125 90 87 80 299 165 4-6 Weeks
P5314.22.125110 125 110 87 88 319 166 4-6 Weeks
P5314.22.160063 160 63 98 66 290 161 4-6 Weeks
P5314.22.160090 160 90 98 80 320 176 4-6 Weeks
P5314.22.160110 160 110 98 83 240 180 4-6 Weeks
P5314.22.160125 160 125 100 93 357 192 4-6 Weeks
P5314.22.180090 180 90 107 79 337 180 4-6 Weeks
P5314.22.180110 180 110 110 105 370 213 4-6 Weeks
P5314.22.180125 180 125 105 87 365 191 4-6 Weeks
P5314.22.180160 180 160 105 98 400 202 4-6 Weeks
P5314.22.200063 200 63 112 63 305 175 4-6 Weeks
P5314.22.200090 200 90 117 80 358 191 4-6 Weeks
P5314.22.200160 200 160 112 98 423 206 4-6 Weeks
P5314.22.225090 225 90 143 104 413 248 4-6 Weeks
P5314.22.225110 225 110 128 100 413 235 4-6 Weeks
P5314.22.225160 225 160 110 120 410 252 4-6 Weeks
P5314.22.250090 250 90 135 96 400 250 4-6 Weeks
P5314.22.250110 250 110 129 82 398 215 4-6 Weeks
P5314.22.250125 250 125 130 87 415 242 4-6 Weeks
P5314.22.250160 250 160 130 110 454 250 4-6 Weeks
P5314.22.250180 250 180 130 105 470 260 4-6 Weeks
P5314.22.280090 280 90 140 79 410 235 4-6 Weeks
P5314.22.280110 280 110 140 82 430 238 4-6 Weeks
P5314.22.280160 280 160 140 98 480 254 4-6 Weeks
P5314.22.280200 280 200 140 112 520 268 4-6 Weeks
P5314.22.315090 315 90 150 79 420 267 4-6 Weeks
P5314.22.315110 315 110 150 82 440 265 4-6 Weeks
P5314.22.315125 315 125 150 87 455 275 4-6 Weeks
P5314.22.315160 315 160 150 98 507 278 4-6 Weeks
P5314.22.315180 315 180 150 105 510 292 4-6 Weeks
P5314.22.315200 315 200 150 112 540 292 4-6 Weeks
SDR17 PN10 dn1 dn2 le1 le2 Z1 Z2 Availability in Hong Kong