  • Mill-Pro supplies pipe and fittings for stormwater drainage installation in Stubbs Road, Hong Kong

    Thursday, April 6, 2017 Mill-Pro supplies pipe and fittings for stormwater drainage installation in Stubbs Road, Hong Kong

    The developer Sun Hung Kai Properties Limited sub contracted the drainage work to Chun Lee Engineering Co Ltd to install a DN 700 (800 OD) PE stormwater connection from the site to a street manhole and into a DSD culvert in Stubbs road under an entrustment project for HK Drainage Services Department (DSD).

    continue reading
  • Mill-Pro supplies pipe and fittings for sewerage pipe replacement at Lin Shing Road, Chai Wan, Hong Kong

    Monday, August 1, 2016 Mill-Pro supplies pipe and fittings for sewerage pipe replacement at Lin Shing Road, Chai Wan, Hong Kong

    Mill-Pro was awarded the supply of M90S PE pipe and fittings for the sewer replacement at 12 Lin Shing Road Chai Wan outside Wan Tsui Estate and Fook Tsui House.

    continue reading
  • Mill-Pro supplies pipe and fittings for sewerage and stormwater pipe replacement in Luen Fat Street, Wan Chai, Hong Kong

    Friday, July 1, 2016 Mill-Pro supplies pipe and fittings for sewerage and stormwater pipe replacement in Luen Fat Street, Wan Chai, Hong Kong

    A building redevelopment by Kong Fortune Investment Ltd & Champ Shine Limited to completely refurbish this building.  Part of the redevelopment included new sewer and storm water connections from the building and along Luen Fat street and into the main sewer and storm water pipes in Johnson road.

    continue reading
  • Mill-Pro supplies pipe and fittings for sewerage pipe replacement in Stanley Link Road, Stanley, Hong Kong

    Sunday, May 1, 2016 Mill-Pro supplies pipe and fittings for sewerage pipe replacement in Stanley Link Road, Stanley, Hong Kong

    An entrustment works project for the HK Drainage Services Department, the main contractor China Harbour Engineering sub contracted the work to install a DN 225 sewer connection to a new building and to upgrade the subsequent man hole and DN 300 pipe connection to the DSD main sewer at the beach in Stanley.

    continue reading
  • Mill-Pro supplies DN900 pipe and fittings for Hastings Wastewater Outfall diffuser replacement.

    Friday, December 2, 2016 Mill-Pro supplies DN900 pipe and fittings for Hastings Wastewater Outfall diffuser replacement.

    Mill-Pro was awarded the pipe supply contract by Solo Plastics for the replacement of the existing 300m long 1000/900mm diameter fibreglass diffuser with a 900mm OD PE diffuser at the Hastings WWTP at East Clive, New Zealand.