Project Archive

  • DASH Solutions Ltd announces it’s name has changed to Mill-Pro (Hong Kong) Ltd

    Tuesday, June 28, 2016

    DASH Solutions Ltd announces it’s name has changed to Mill-Pro (Hong Kong) Ltd to reflect a change in ownership and it’s regional expansion – GS Global corporation of Korea (001250:KS) acquires 40% of Mill-Pro (Hong Kong) Ltd.

    continue reading
  • Mill-Pro supplies DN900 pipe and fittings for Hastings Wastewater Outfall diffuser replacement.

    Friday, December 2, 2016 Mill-Pro supplies DN900 pipe and fittings for Hastings Wastewater Outfall diffuser replacement.

    Mill-Pro was awarded the pipe supply contract by Solo Plastics for the replacement of the existing 300m long 1000/900mm diameter fibreglass diffuser with a 900mm OD PE diffuser at the Hastings WWTP at East Clive, New Zealand.

    continue reading
  • Mill-Pro supplies pipe and fittings for sewerage pipe replacement at Lin Shing Road, Chai Wan, Hong Kong

    Monday, August 1, 2016 Mill-Pro supplies pipe and fittings for sewerage pipe replacement at Lin Shing Road, Chai Wan, Hong Kong

    Mill-Pro was awarded the supply of M90S PE pipe and fittings for the sewer replacement at 12 Lin Shing Road Chai Wan outside Wan Tsui Estate and Fook Tsui House.

    continue reading
  • Mill-Pro supplies pipe and fittings for sewerage and stormwater pipe replacement in Luen Fat Street, Wan Chai, Hong Kong

    Friday, July 1, 2016 Mill-Pro supplies pipe and fittings for sewerage and stormwater pipe replacement in Luen Fat Street, Wan Chai, Hong Kong

    A building redevelopment by Kong Fortune Investment Ltd & Champ Shine Limited to completely refurbish this building.  Part of the redevelopment included new sewer and storm water connections from the building and along Luen Fat street and into the main sewer and storm water pipes in Johnson road.

    continue reading
  • Mill-Pro supplies pipe and fittings for sewerage pipe replacement in Stanley Link Road, Stanley, Hong Kong

    Sunday, May 1, 2016 Mill-Pro supplies pipe and fittings for sewerage pipe replacement in Stanley Link Road, Stanley, Hong Kong

    An entrustment works project for the HK Drainage Services Department, the main contractor China Harbour Engineering sub contracted the work to install a DN 225 sewer connection to a new building and to upgrade the subsequent man hole and DN 300 pipe connection to the DSD main sewer at the beach in Stanley.

    continue reading
  • Mill-Pro supplies 700mt fabricated & coated structural steel for Nadi International Airport modernisation project

    Wednesday, January 27, 2016 Mill-Pro supplies 700mt fabricated & coated structural steel for Nadi International Airport modernisation project

    27 January 2015, Mill-Pro takes over the supply contract for pre-fabricated structural steel for Hawkins Infrastructure and Pacific Building Solutions for the Nadi international airport modernisation project.

    continue reading
  • Mill-Pro supplies 1.5km of marine grade stainless steel balustrade for the Vanuatu Tourism & Infrastructure Project

    Wednesday, March 1, 2017 Mill-Pro supplies 1.5km of marine grade stainless steel balustrade for the Vanuatu Tourism & Infrastructure Project

    The Vanuatu Tourism Infrastructure Project (VTIP) is funded by the New Zealand Government and the Vanuatu Government. The goal of the project is to contribute to a buoyant, resilient tourism sector that provides greater economic returns from the tourism sector for Vanuatu.

    continue reading